The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
377 перегляда

The Muharraq STP Geotechnical Instruments by Encardio rite

Завантажено 4 років тому

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Відредагувати або змінити розмір будь-якого зображення натиснувши на попередній перегляд
Відредагувати будь-яке зображення натиснувши на попередній перегляд
Uploading 0 зображення (0% завершено)
Завантажується черга зображень. Це може зайняти деякий час.
Завантаження завершено
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or sign in to save this content into your account.
No зображення have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    або скасуватискасувати решту
    Увага: Деякі зображення не були завантажені. детальніше
    Перевірте звіт про помилки для отримання більш докладної інформації.
    JPG PNG BMP GIF WEBP 50 MB