The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
369 weergaven

The Muharraq STP Geotechnical Instruments by Encardio rite

Geüpload: 4 jaren geleden

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Bewerk of pas formaat aan van de afbeelding door op de voorvertoning te klikken
Bewerk iedere afbeelding door het voorbeeld aan te raken
Uploading 0 afbeelding (0% afgerond)
De wachtrij wordt geupload, dit duurt een aantal seconden voordat het gereed is.
Upload voltooid
Geuploade afbeeldingen toegevoegd aan . U kunt een nieuw album maken met de afbeeldingen die net zijn geupload.
Geuploade afbeeldingen toegevoegd aan .
U kunt een nieuw album maken met de afbeeldingen die net zijn geupload. U moet Maak een account of Log in om de informatie op te slaan in uw account.
Geen afbeelding is geupload
Some errors have occurred and the system couldn't process your request.
    Registreer to be able to create private albums and delete images after upload.
    Opmerking: bepaalde afbeeldingen kunnen niet geüpload worden. Meer informatie
    Zie het foutrapport voor meer informatie!
    JPG PNG BMP GIF WEBP 50 MB