The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
335 просмотра

The Muharraq STP Geotechnical Instruments by Encardio rite

Загружено 4 года назад

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Нажмите на миниатюру, чтобы отредактировать изображение или изменить его размер
Отредактируйте изображение касанием окна предпросмотра.
Загружается 0 изображение (0% завершено)
Загружается очередь изображений. Это может занять некоторое время.
Загрузка завершена
Загруженное содержимое добавлено к альбому . Вы можете создать новый альбом с загруженным содержимым.
Загруженное содержимое добавлено к альбому .
Вы можете создать новый альбом с загруженным содержимым. Вы должны создать аккаунт или войти, чтобы сохранить это содержимое в свой аккаунт.
Не было загружено ни одного изображение.
Some errors have occurred and the system couldn't process your request.
    Зарегистрируйтесь to be able to create private albums and delete images after upload.
    Внимание: Некоторые изображения не были загружены. подробнее
    Проверьте отчет об ошибках для получения более подробной информации.
    JPG PNG BMP GIF WEBP 50 MB