The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
345

The Muharraq STP Geotechnical Instruments by Encardio rite

4 年前にアップロード

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
画像のプレビューをクリックして編集または画像をリサイズ
プレビューをタッチして編集
アップロード中 0 画像 (0% 完了)
キューのアップロードが進行中です。完了まで数秒ほどかかります。
アップロード完了
アップロードが完了したコンテンツはに追加されました。 アップロードされたコンテンツに対して新規アルバムを作成が可能です。
アップロードが完了したコンテンツはに追加されました。
アップロードされたコンテンツに対して新規アルバムを作成が可能です。 このコンテンツをアカウントに保存するには、アカウントを作成 または サインイン である必要があります。
アップロードされた画像はありません。
Some errors have occurred and the system couldn't process your request.
    会員登録 to be able to create private albums and delete images after upload.
    または キャンセル残りも全てキャンセルする
    注意:一部の画像がアップロード出来ませんでした。 もっと詳しく
    詳しくはエラーレポートをご覧下さい。
    JPG PNG BMP GIF WEBP 50 MB