The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
347 visninger

The Muharraq STP Geotechnical Instruments by Encardio rite

Uploaded 4 år siden

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Rediger eller skalere et billede ved at klikke på billedeksemplet
Rediger et billede ved at trykke på billedeksemplet
Uploader 0 billede (0% færdig)
Køen bliver uploadet, det tager kun få sekunder at fuldføre.
Upload gennemført
Uploadet indhold tilføjet til . Du kan opret et nyt album med indholdet lige uploadet.
Uploadet indhold tilføjet til .
Du kan opret et nyt album med indholdet lige uploadet. You must opret en konto or log ind to save this content into your account.
Ingen billede er blevet uploadet
Some errors have occurred and the system couldn't process your request.
    Tilmeld to be able to create private albums and delete images after upload.
    Bemærk: Nogle billeder kunne ikke uploades. se mere
    Check fejl rapporten for mere information.
    JPG PNG BMP GIF WEBP 50 MB