The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
351 مشاهدة

The Muharraq STP Geotechnical Instruments by Encardio rite

مرفوع 4 سنة مضى

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
تعديل أو تغيير حجم أي صورة من خلال النقر على معاينة الصورة
Edit any image by touching the image preview
يتم تحميل 0 خانة فارغة (0% أكتمل)
يجري الآن تحميل القائمة، سوف يستغرق عدة ثواني للإنتهاء.
تم الرفع
تمت إضافة المحتوى الذي تم تحميله إلى . يمكنك إنشاء ألبوم جديد. مع المحتوى الذي تم تحميله للتو.
تمت إضافة المحتوى الذي تم تحميله إلى .
يمكنك إنشاء ألبوم جديد. مع المحتوى الذي تم تحميله للتو. You must إنشاء حساب or تسجيل الدخول to save this content into your account.
لا خانة فارغة تم تحميلها
Some errors have occurred and the system couldn't process your request.
    تسجيل to be able to create private albums and delete images after upload.
    أو إلغاءإلغاء ما تبقى
    ملاحظة : بعض الصور لم يتم رفعها بنجاح. إعرف المزيد
    تحقق من تقرير الخطأللمزيد من المعلومات
    JPG PNG BMP GIF WEBP 50 MB