The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
315 次浏览

The Muharraq STP Geotechnical Instruments by Encardio rite

已上传 4 年 前

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
通过点击图像预览来编辑或调整任意图像的大小
通过点击图像预览来调整任意图像
上传 0 图片 (0% 完成)
队列上传中. 顷刻间便能完成.
上传完毕
图片已经添加到 . 您可以将刚刚上传的图片 创建相册.
图片已经添加到 .
您可以将刚刚上传的图片 创建相册. 您必须 注册账户登录 才能将此内容保存到您的帐户中。
没有 图片被上传
Some errors have occurred and the system couldn't process your request.
    注册 to be able to create private albums and delete images after upload.
    注意: 一些图像不能上传. 了解更多
    检查 错误报告 更多信息.
    JPG PNG BMP GIF WEBP 50 MB