The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
331 نمایش

The Muharraq STP Geotechnical Instruments by Encardio rite

4 سال قبل آپلود شد

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Edit or resize any image by clicking the image preview
Edit any image by touching the image preview
Uploading 0 عکس (0% complete)
The queue is being uploaded, it should take just a few seconds to complete.
بارگذاری کامل شد
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or sign in to save this content into your account.
No عکس have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    یا لغولغو باقی مانده ها
    توجه: امکان آپلود برخی تصاویر موجود نیست. بیشتر بخوانید.
    برای توضیحات بیشتر گزارش خطاها را مطلعه کنید
    JPG PNG BMP GIF WEBP 50 MB