The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/
343 zobrazení

The Muharraq STP Geotechnical Instruments by Encardio rite

Nahráno před 4 let

The Muharraq STP micro tunnelling project involved the construction of sewage treatment plant (STP), a 16.5 km Deep Gravity Sewer (DGS) with 50 Shafts and network connections. Encardio-rite was responsible for the complete monitoring and surveying solutions for the project including the supply of geotechnical instruments & sensors. Read more: https://www.encardio.com/muharraq-sewer-treatment-plant-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Upravte nebo změňte velikost libovolného obrázku kliknutím na náhled obrázku
Upravte jakýkoli snímek tím, že se dotknete náhledu obrázku
Nahrávání 0 obrázek (0% kompletní)
Fronta se nahrává. Proces nahrávání by měl trvat jen několik sekund.
Nahrávání dokončeno
Nahraný obsah byl přidán do . Můžete vytvořit nové album s právě nahraným obsahem.
Nahraný obsah byl přidán do .
Můžete vytvořit nové album s právě nahraným obsahem. Musíte se vytvořit účet nebo přihlásit se pro uložení tohoto obsahu do svého účtu.
Žádné obrázek nebyly nahrány
Some errors have occurred and the system couldn't process your request.
    Přihlásit se to be able to create private albums and delete images after upload.
    nebo zrušitzrušit zbývající
    Upozornění: Některé obrázky nelze nahrát. dozvědět se více
    Zkontrolujte chybovou zprávu kde se dozvíte více informací.
    JPG PNG BMP GIF WEBP 50 MB