The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/
238 visualizações

Udhampur Baramulla Rail Link Geotechnical Instrumentation

Uploaded 4 anos atrás

The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Edit or resize any image by clicking the image preview
Edit any image by touching the image preview
Uploading 0 imagem (0% completo)
The queue is being uploaded, it should take just a few seconds to complete.
Envio completo
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or sign in to save this content into your account.
No imagem have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    Nota: Algumas imagens não puderam ser enviadas. Saber mais
    Verifique o relatório de erro para mais informações.
    JPG PNG BMP GIF WEBP 50 MB