The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/
274 visninger

Udhampur Baramulla Rail Link Geotechnical Instrumentation

Lastet opp 4 år siden

The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Rediger eller endre størrelse på hvilket som helst bilde ved å klikke på forhåndsvisningen
Rediger et bilde ved å ta på miniatyrbildet
Laster opp 0 bilde (0% fullført)
Køen lastes opp. Dette burde bare ta noen få sekunder å fullføre.
Opplasting fullført
Opplastet innhold lagt til i . Du kan opprett nytt album med innholdet du nettopp lastet opp.
Opplastet innhold lagt til i .
Du kan opprett nytt album med innholdet du nettopp lastet opp. Du må opprett konto eller logg inn for å lagre dette innholdet til kontoen din.
Ingen bilde ble lastet opp.
Some errors have occurred and the system couldn't process your request.
    Registrer deg to be able to create private albums and delete images after upload.
    eller avbrytavbryt gjenstående
    Advarsel: Noen av bildene kunne ikke lastes opp. Lær mer
    Sjekk feilmeldingen for mer informasjon.
    JPG PNG BMP GIF WEBP 50 MB