The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/
256 vaatamist

Udhampur Baramulla Rail Link Geotechnical Instrumentation

Üles laetud 4 aastat tagasi

The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Muuda pilti või pildi suurust vajutades pisipildile
Edit any image by touching the image preview
Uploading 0 pilt (0% complete)
The queue is being uploaded, it should take just a few seconds to complete.
Upload complete
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or logi sisse to save this content into your account.
No pilt have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    Note: Some images couldn't be uploaded. learn more
    Check the error report for more information.
    JPG PNG BMP GIF WEBP 50 MB