The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/
252 visitas

Udhampur Baramulla Rail Link Geotechnical Instrumentation

Subida hace 4 años

The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Edita o redimensiona cualquier imagen haciendo click en la previsualización
Edita cualquier imagen tocando la previsualización
Subiendo 0 imagen (0% completado)
Subida en curso, debería tomar solo un momento para completar el proceso.
Subida completada
Contenido subido agregado a . Puedes crear un nuevo ábum con el contenido recién subido.
Contenido subido agregado a .
Puedes crear un nuevo ábum con el contenido recién subido. Debes crear una cuenta o entrar para guardar este contenido en tu cuenta.
No se han subido imagen
Some errors have occurred and the system couldn't process your request.
    Regístrate to be able to create private albums and delete images after upload.
    Nota: Algunas imágenes no se pudieron subir. conocer más
    Revisa el reporte de error para más información.
    JPG PNG BMP GIF WEBP 50 MB