The toughest and challenging section of the Udhampur Srinagar Baramulla Rail Link is the 90 km long Katra to Laole section, in which 80% of the railway line passes through a tunnel or is on a bridge. Encardio-rite was awarded the instrumentation and monitoring contract for almost 20 large tunnels along with the supply of geotechnical instruments. Read more: https://www.encardio.com/udhampur-srinagar-baramulla-rail-link/
Le contenu envoyé sera déplacé vers cet album nouvellement créé. Vous devez créer un compte ou se connecter si vous souhaitez modifier cet album plus tard.