The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/
367 vaatamist

Tunnel Boring Machines for STEP Project, Abu Dhabi

Üles laetud 5 aastat tagasi

The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Muuda pilti või pildi suurust vajutades pisipildile
Edit any image by touching the image preview
Uploading 0 pilt (0% complete)
The queue is being uploaded, it should take just a few seconds to complete.
Upload complete
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or logi sisse to save this content into your account.
No pilt have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    Note: Some images couldn't be uploaded. learn more
    Check the error report for more information.
    JPG PNG BMP GIF WEBP 50 MB