The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/
315 次浏览

Tunnel Boring Machines for STEP Project, Abu Dhabi

已上传 5 年 前

The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
通过点击图像预览来编辑或调整任意图像的大小
通过点击图像预览来调整任意图像
上传 0 图片 (0% 完成)
队列上传中. 顷刻间便能完成.
上传完毕
图片已经添加到 . 您可以将刚刚上传的图片 创建相册.
图片已经添加到 .
您可以将刚刚上传的图片 创建相册. 您必须 注册账户登录 才能将此内容保存到您的帐户中。
没有 图片被上传
Some errors have occurred and the system couldn't process your request.
    注册 to be able to create private albums and delete images after upload.
    注意: 一些图像不能上传. 了解更多
    检查 错误报告 更多信息.
    JPG PNG BMP GIF WEBP 50 MB