The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/
335 visninger

Tunnel Boring Machines for STEP Project, Abu Dhabi

Lastet opp 5 år siden

The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Rediger eller endre størrelse på hvilket som helst bilde ved å klikke på forhåndsvisningen
Rediger et bilde ved å ta på miniatyrbildet
Laster opp 0 bilde (0% fullført)
Køen lastes opp. Dette burde bare ta noen få sekunder å fullføre.
Opplasting fullført
Opplastet innhold lagt til i . Du kan opprett nytt album med innholdet du nettopp lastet opp.
Opplastet innhold lagt til i .
Du kan opprett nytt album med innholdet du nettopp lastet opp. Du må opprett konto eller logg inn for å lagre dette innholdet til kontoen din.
Ingen bilde ble lastet opp.
Some errors have occurred and the system couldn't process your request.
    Registrer deg to be able to create private albums and delete images after upload.
    eller avbrytavbryt gjenstående
    Advarsel: Noen av bildene kunne ikke lastes opp. Lær mer
    Sjekk feilmeldingen for mer informasjon.
    JPG PNG BMP GIF WEBP 50 MB