The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/
331 zobrazenia

Tunnel Boring Machines for STEP Project, Abu Dhabi

Nahrané pred 5 rokov

The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Edit or resize any image by clicking the image preview
Edit any image by touching the image preview
Uploading 0 obrázok (0% hotovo)
The queue is being uploaded, it should take just a few seconds to complete.
Nahrávanie dokončené
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or sign in to save this content into your account.
No obrázok have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    Upozornenie: Niekteré obrázky nejde nahrať. dozvedieť sa viac
    Skontrolujte chybovú správu, kde sa dozviete viac informácií.
    JPG PNG BMP GIF WEBP 50 MB