The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/
329

Tunnel Boring Machines for STEP Project, Abu Dhabi

5 年前にアップロード

The STEP project involved five Herrenknecht Tunnel Boring Machines for the construction of 41m of a deep #sewertunnel, 43km of supply tunnels, which are smaller in diameter to transport the sewage to the treatment plants, and an underground pumping station at Al Wathba with a pumping capacity of 30m³ per second. Check this project details here: https://www.encardio.com/strategic-tunnel-enhancement-programme/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
画像のプレビューをクリックして編集または画像をリサイズ
プレビューをタッチして編集
アップロード中 0 画像 (0% 完了)
キューのアップロードが進行中です。完了まで数秒ほどかかります。
アップロード完了
アップロードが完了したコンテンツはに追加されました。 アップロードされたコンテンツに対して新規アルバムを作成が可能です。
アップロードが完了したコンテンツはに追加されました。
アップロードされたコンテンツに対して新規アルバムを作成が可能です。 このコンテンツをアカウントに保存するには、アカウントを作成 または サインイン である必要があります。
アップロードされた画像はありません。
Some errors have occurred and the system couldn't process your request.
    会員登録 to be able to create private albums and delete images after upload.
    または キャンセル残りも全てキャンセルする
    注意:一部の画像がアップロード出来ませんでした。 もっと詳しく
    詳しくはエラーレポートをご覧下さい。
    JPG PNG BMP GIF WEBP 50 MB