Encardio-rite was responsible for the execution of complete monitoring services for the Teesta Stage-V hydroelectric plant. The scope of work included supply, installation and manual as well as automatic monitoring. Instruments installed included a piezometer, water level recorder, pressure cells, borehole extensometer, joint meter etc. Read more: https://www.encardio.com/tala-hydroelectric-project/
285 visningar

Teesta Stage V Hydroelectric Plant Monitoring Services by Encardio

Uppladdad 5 år sedan

Encardio-rite was responsible for the execution of complete monitoring services for the Teesta Stage-V hydroelectric plant. The scope of work included supply, installation and manual as well as automatic monitoring. Instruments installed included a piezometer, water level recorder, pressure cells, borehole extensometer, joint meter etc. Read more: https://www.encardio.com/tala-hydroelectric-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Edit or resize any image by clicking the image preview
Edit any image by touching the image preview
Uploading 0 bild (0% complete)
The queue is being uploaded, it should take just a few seconds to complete.
Uppladdning klar
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or sign in to save this content into your account.
No bild have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    eller avbrytavbryt kvarvarande
    Notis: Vissa bilder kunde inte laddas upp läs mer
    Kolla felrapporteringen för mer information.
    JPG PNG BMP GIF WEBP 50 MB