Encardio-rite was responsible for the execution of complete monitoring services for the Teesta Stage-V hydroelectric plant. The scope of work included supply, installation and manual as well as automatic monitoring. Instruments installed included a piezometer, water level recorder, pressure cells, borehole extensometer, joint meter etc. Read more: https://www.encardio.com/tala-hydroelectric-project/
248

Teesta Stage V Hydroelectric Plant Monitoring Services by Encardio

5 年前にアップロード

Encardio-rite was responsible for the execution of complete monitoring services for the Teesta Stage-V hydroelectric plant. The scope of work included supply, installation and manual as well as automatic monitoring. Instruments installed included a piezometer, water level recorder, pressure cells, borehole extensometer, joint meter etc. Read more: https://www.encardio.com/tala-hydroelectric-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
画像のプレビューをクリックして編集または画像をリサイズ
プレビューをタッチして編集
アップロード中 0 画像 (0% 完了)
キューのアップロードが進行中です。完了まで数秒ほどかかります。
アップロード完了
アップロードが完了したコンテンツはに追加されました。 アップロードされたコンテンツに対して新規アルバムを作成が可能です。
アップロードが完了したコンテンツはに追加されました。
アップロードされたコンテンツに対して新規アルバムを作成が可能です。 このコンテンツをアカウントに保存するには、アカウントを作成 または サインイン である必要があります。
アップロードされた画像はありません。
Some errors have occurred and the system couldn't process your request.
    会員登録 to be able to create private albums and delete images after upload.
    または キャンセル残りも全てキャンセルする
    注意:一部の画像がアップロード出来ませんでした。 もっと詳しく
    詳しくはエラーレポートをご覧下さい。
    JPG PNG BMP GIF WEBP 50 MB