Encardio-rite was responsible for the execution of complete monitoring services for the Teesta Stage-V hydroelectric plant. The scope of work included supply, installation and manual as well as automatic monitoring. Instruments installed included a piezometer, water level recorder, pressure cells, borehole extensometer, joint meter etc. Read more: https://www.encardio.com/tala-hydroelectric-project/
275 vaatamist

Teesta Stage V Hydroelectric Plant Monitoring Services by Encardio

Üles laetud 5 aastat tagasi

Encardio-rite was responsible for the execution of complete monitoring services for the Teesta Stage-V hydroelectric plant. The scope of work included supply, installation and manual as well as automatic monitoring. Instruments installed included a piezometer, water level recorder, pressure cells, borehole extensometer, joint meter etc. Read more: https://www.encardio.com/tala-hydroelectric-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Muuda pilti või pildi suurust vajutades pisipildile
Edit any image by touching the image preview
Uploading 0 pilt (0% complete)
The queue is being uploaded, it should take just a few seconds to complete.
Upload complete
Uploaded content added to . You can create a new album with the content just uploaded.
Uploaded content added to .
You can create a new album with the content just uploaded. You must create an account or logi sisse to save this content into your account.
No pilt have been uploaded
Some errors have occurred and the system couldn't process your request.
    Sign up to be able to create private albums and delete images after upload.
    Note: Some images couldn't be uploaded. learn more
    Check the error report for more information.
    JPG PNG BMP GIF WEBP 50 MB