Brenner Base Tunnel is a 55 km long nearly horizontal rail tunnel with 2 parallel tubes that run through the base of Eastern Alps. This tunnel runs between the railway stations of Innsbruck and Fortezza and is connected to South Innsbruck by an underground by-pass.
Encardio-rite was responsible for the complete monitoring and instrumentation of the tunnel. Read more: https://www.encardio.com/brenner-base-tunnel/
353 次浏览

Brenner Base Tunnel Geotechnical Monitoring by Encardio rite

已上传 4 年 前

Brenner Base Tunnel is a 55 km long nearly horizontal rail tunnel with 2 parallel tubes that run through the base of Eastern Alps. This tunnel runs between the railway stations of Innsbruck and Fortezza and is connected to South Innsbruck by an underground by-pass.
Encardio-rite was responsible for the complete monitoring and instrumentation of the tunnel. Read more: https://www.encardio.com/brenner-base-tunnel/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
通过点击图像预览来编辑或调整任意图像的大小
通过点击图像预览来调整任意图像
上传 0 图片 (0% 完成)
队列上传中. 顷刻间便能完成.
上传完毕
图片已经添加到 . 您可以将刚刚上传的图片 创建相册.
图片已经添加到 .
您可以将刚刚上传的图片 创建相册. 您必须 注册账户登录 才能将此内容保存到您的帐户中。
没有 图片被上传
Some errors have occurred and the system couldn't process your request.
    注册 to be able to create private albums and delete images after upload.
    注意: 一些图像不能上传. 了解更多
    检查 错误报告 更多信息.
    JPG PNG BMP GIF WEBP 50 MB