Brenner Base Tunnel is a 55 km long nearly horizontal rail tunnel with 2 parallel tubes that run through the base of Eastern Alps. This tunnel runs between the railway stations of Innsbruck and Fortezza and is connected to South Innsbruck by an underground by-pass.
Encardio-rite was responsible for the complete monitoring and instrumentation of the tunnel. Read more: https://www.encardio.com/brenner-base-tunnel/
363 צפיות

Brenner Base Tunnel Geotechnical Monitoring by Encardio rite

הועלה לפני 4 שנתיים

Brenner Base Tunnel is a 55 km long nearly horizontal rail tunnel with 2 parallel tubes that run through the base of Eastern Alps. This tunnel runs between the railway stations of Innsbruck and Fortezza and is connected to South Innsbruck by an underground by-pass.
Encardio-rite was responsible for the complete monitoring and instrumentation of the tunnel. Read more: https://www.encardio.com/brenner-base-tunnel/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
ערוך או שנה את גודל התמונה על ידי לחיצה על התמונה או אייקון העריכה
ערוך או שנה את גודל התמונה על ידי לחיצה על תצוגה מקדימה או אייקון העריכה
העלאת 0 תמונה (0% הושלם)
התמונות בהעלאה, יקח כמה שניות עד שתקבל לינק להורדה\הטמעה
העלאה הושלמה
התמונות שהועלו, התווספו לאלבום הינך יכול ליצור אלבום חדש אלבום חדש עם התוכן שהועלה.
התמונות שהועלו, התווספו לאלבום
הינך יכול ליצור אלבום חדש אלבום חדש עם התוכן שהועלה. You must create an account or היכנס to save this content into your account.
תקלה בעת העלאת קבצי תמונה, נסה שוב
Some errors have occurred and the system couldn't process your request.
    הירשם to be able to create private albums and delete images after upload.
    או ביטולבטל את העלאה
    שים לב: חלק מהתמונות לא הועלו למד עוד
    עיין ב- דו"ח השגיאות למידע נוסף.
    JPG PNG BMP GIF WEBP 50 MB