The instrumentation scheme for Coba Fort included monitoring of slope movement, settlement, water pressure, and ground cracks. Encardio-rite was awarded the task of its monitoring and instrumentation. The scope of work covered the supply of instruments, installation, manual and automatic monitoring and setting up a web data management system.
342 görüntülemeler

Cabo Fort, Goa Geotechnical Instrumentation by Encardio rite

Yüklenen resim 4 yıl önce

The instrumentation scheme for Coba Fort included monitoring of slope movement, settlement, water pressure, and ground cracks. Encardio-rite was awarded the task of its monitoring and instrumentation. The scope of work covered the supply of instruments, installation, manual and automatic monitoring and setting up a web data management system.

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Önizlemeyi tıklayarak bir resmi düzenleyin veya ölçeklendirin
Önizleme dokunarak bir görüntüyü düzenlenleyin
0 resim yükleniyor (0% tamamlandı)
Sıra işlenir, bu birkaç saniye sürer.
Yükleme Tamamlandı
Yüklenen resimler öğesine eklendi. Yeni yüklenen içerikle Yeni albüm oluştur yapabilirsiniz.
Yüklenen resimler öğesine eklendi.
Yeni yüklenen içerikle Yeni albüm oluştur yapabilirsiniz. Bu içeriği hesabınıza kaydetmek için Hesap oluştur veya Giriş gerekir.
resim yüklenmedi
Some errors have occurred and the system couldn't process your request.
    Kayıt ol to be able to create private albums and delete images after upload.
    veya İptal EtYüklemeyi iptal et
    Not : Bazı resimler yüklenemedi. Daha fazla bilgi
    Daha fazla bilgi için hata raporunu kontrol ediniz.
    JPG PNG BMP GIF WEBP 50 MB