The instrumentation scheme for Coba Fort included monitoring of slope movement, settlement, water pressure, and ground cracks. Encardio-rite was awarded the task of its monitoring and instrumentation. The scope of work covered the supply of instruments, installation, manual and automatic monitoring and setting up a web data management system.
372 dilihat

Cabo Fort, Goa Geotechnical Instrumentation by Encardio rite

Terunggah 4 tahun yang lalu

The instrumentation scheme for Coba Fort included monitoring of slope movement, settlement, water pressure, and ground cracks. Encardio-rite was awarded the task of its monitoring and instrumentation. The scope of work covered the supply of instruments, installation, manual and automatic monitoring and setting up a web data management system.

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Ubah atau ukur ulang gambar apapun dengan mengklik pratinjau gambar
Edit gambar apa pun dengan menyentuh pratinjau gambar
Mengunggah 0 gambar (0% selesai)
Antrian sedang diunggah, hal ini harusnya berlangsung beberapa saat untuk selesai.
Upload selesai
Konten terunggah ditambahkan ke . Anda dapat buat sebuah album baru dengan konten yang baru saja terunggah.
Konten terunggah ditambahkan ke .
Anda dapat buat sebuah album baru dengan konten yang baru saja terunggah. Anda harus buat sebuah akun atau masuk untuk menyimpan konten ini ke akun Anda.
tidak ada gambar yang barus saja terunggah
Some errors have occurred and the system couldn't process your request.
    Mendaftar to be able to create private albums and delete images after upload.
    atau batalbatalkan sisanya
    Catatan: Beberapa gambar tidak dapat diunggah. pelajari lebih banyak
    Periksa laporan kesalahan untuk informasi lebih lanjut.
    JPG PNG BMP GIF WEBP 50 MB