Encardio Rite  was associated with the load test instrumentation of Bogibeel Bridge, just before our Prime Minister, Mr Narendra Modi, inaugurated it. The complete load test was executed successfully with the help of real-time monitoring provided by our team. Not only did we supply the sensors, data loggers, and data management software, our expert team also provided the installation and monitoring services at the site, overcoming all the challenges. Read more: https://www.encardio.com/bogibeel-rail-cum-road-bridge-project/
359 lượt xem

Bogibeel Bridge Geotechnical Monitoring by Encardio rite

Đã up lên cách đây 4 năm

Encardio Rite was associated with the load test instrumentation of Bogibeel Bridge, just before our Prime Minister, Mr Narendra Modi, inaugurated it. The complete load test was executed successfully with the help of real-time monitoring provided by our team. Not only did we supply the sensors, data loggers, and data management software, our expert team also provided the installation and monitoring services at the site, overcoming all the challenges. Read more: https://www.encardio.com/bogibeel-rail-cum-road-bridge-project/

Tip: Use Image link when sharing on other sites. Image URL has limited bandwidth.
Sửa hoặc chỉnh cỡ bất kì ảnh nào bởi nhấp vào xem thử
Sửa bất kì ảnh nào bởi chạm vào xem thử
Đang tải lên 0 ảnh (0% Hoàn tất)
Danh sách đang được tải lên, nó có thể mất đôi chút thời gian để hoàn thành.
Upload xong rồi!
Đã tải nội dung lên . You can tạo album mới with the content just uploaded.
Đã tải nội dung lên .
You can tạo album mới with the content just uploaded. You must tạo tài khoản or đăng nhập to save this content into your account.
No ảnh have been uploaded
Some errors have occurred and the system couldn't process your request.
    Đăng ký to be able to create private albums and delete images after upload.
    Lưu ý: Một số ảnh không được upload. xem tiếp
    Chọn thông báo lỗi để biết thêm chi tiết.
    JPG PNG BMP GIF WEBP 50 MB